Veterans Parkway Interior Roundabout Improvements

Overview Designed to be experienced in motion, the Veterans Parkway roundabout transforms a functional piece of transportation infrastructure into a memorable landscape and community gateway. Process Rather than treating the center island as a conventional planting bed, the landscape architecture establishes a bold, three-dimensional composition that reveals itself differently from every approach. Results The design […]

Youth Sports Complex Master Plan

Overview DLZ completed the City of Portage new Youth Sports Complex Master Plan in April 2026, creating a vision for a premier community and tournament-level sports destination. results The master plan includes a multi-field baseball complex with tee-ball, Cal Ripken and Babe Ruth fields centered around a new press box/concessions facility, along with batting cages, […]

Toll Road Feasibility Study

Overview DLZ provided services to develop a Consolidation Feasibility Study and Site Selection Report, evaluating the feasibility of consolidating two maintenance facilities into a new centralized maintenance campus. Process The study assessed the following site suitability, infrastructure availability, operational requirements, sustainability objectives, project risks, delivery strategies, implementation considerations, budget, and schedule. The project goals were […]

Battell Park

Overview The City of Mishawaka commissioned DLZ to develop a park master plan for Battell Park, including relocation of its historic 1884 Soldiers’ Monument, designing a new Veterans plaza and walk, adding a playground, splash pad, and various overlook areas. This 1860s park is on the National Register of Historic Places requiring careful consideration of […]

City Center Monon Greenway

Overview DLZ was the lead designer and provided electrical and structural engineering services for the Monon Greenway in Carmel between City Center and Carmel Drives. Process The project included concept design, construction and bid documents, and construction observation. This $5 million project transformed an existing 10-foot wide basic asphalt path into an 18-foot wide urban […]

Founders Square Park

Overview Founders Square is a community park enclosed by the urban street grid that defines its space. It is reminiscent of parks designed during America’s City Beautiful period exhibiting loosely curved walks, expansive lawn, ornamental picket fencing and masonry columns, accent lighting, and landscape plantings, which supplement its existing mature tree canopy. Process DLZ provided […]

Portage DPW Masterplan

Overview DLZ was asked to perform an assessment study on the existing buildings and site conditions at the Department of Public Works in Portage, Michigan. Analyzed safety of 5 structures 0 acres 0 Process This study analyzed the function, structural condition, vehicular access, space requirements, and safety of 5 structures on approximately 7.5 acres of […]

Greenwood DPW Building

Overview To better serve the operational needs of the City of Greenwood, DLZ designed a new Department of Public Works (DPW) facility to replace an outdated building that had surpassed its functional lifespan. The new facility provides the space, equipment, and amenities necessary to support five departments and enhance day-to-day operations. gross square feet 0 […]

Shelby County Maintenance Highway Garage

Overview The project involved the development of a comprehensive multi-building complex designed to support the County’s operational needs. The new facility includes a Maintenance Building, Recycling Center, Transfer Building, Fueling Center, and multiple Storage Buildings, creating a centralized hub for essential services. Process DLZ worked with an existing site that housed the County’s original maintenance […]

US 27 – From KY 34 to the Lancaster Bypass

Overview DLZ is a subconsultant to Stantec Consulting Services, Inc. for the project, which involves completing the realignment and improvement for US 27 from Standford to KY 34 north of Lancaster, including the Bypass around the west side of Lancaster. Process DLZ’s primary responsibilities for the project are surveying, utility coordination, preparing right of way […]

DuPage County Various Traffic Signal Design Services

Overview DLZ prepared construction documents for 5 signalized intersections along County Farm Road (Williams St to Jewel Rd) in front of the DuPage County Government Center in Wheaton, Illinois. Process The scope of services includes a topographic survey with ROW along the corridor, pavement marking plans, the evaluation and redesign of existing ADA ramps, the […]

SR 930 INDOT (Intersection Alternative Analysis)

Overview DLZ was selected by the Indiana Department of Transportation (INDOT) Fort Wayne District to complete the Preliminary Engineering for the SR 930 Intersection Improvements project in the City of New Haven. Process The intersection of SR 930 and Maplecrest Road has experienced a significant number of rear end crashes, which indicates a congestion issue […]

Brent Spence Bridge

Overview The Brent Spence Bridge Corridor Project consists of three distinct and major components: the approach work (highways, bridges, retaining walls) in Covington, the new “Companion Bridge” over the Ohio River, and the approach work in Cincinnati. Process DLZ is the Geotechnical Engineer-of-Record for all work in Covington and is also providing all geotechnical drilling […]

Indiana State Road 120

Overview DLZ was selected by the Indiana Department of Transportation (INDOT) Fort Wayne District to complete the Preliminary Engineering for the SR 120/SR15 Small Towns Pavement Replacement project in the Town of Bristol, Indiana. Process This project involved pavement reconstruction and rehabilitation along SR 120 in Bristol from 0.86 miles west of the SR 15 […]

US 20

Overview DLZ was hired by the Airport Authority to prepare an engineering study that would evaluate several alternative routes for the relocation of Lincolnway West. Lincolnway West serves as a gateway to the City of South Bend as visitors travel from US-31/US-20 past the South Bend International Airport to downtown. In 2000, the South Bend […]

Garrard County US 27

Overview DLZ is working as a subconsultant for Stantec Consulting Services, Inc. on this project, the northernmost section of US 27. The project involves the reconstruction of 4.3 miles of a two-lane roadway with a typical section to a four-lane depressed median. Process DLZ’s primary responsibilities for the project are surveying, utility coordination, preparing right […]

State Road Improvement Project Early Preliminary Engineering Study

Overview The State Road Improvement Project was an Early Preliminary Engineering (EPE) study and Environmental Assessment (EA) conducted for the Washtenaw County Road Commission (WCRC) for a 3-mile segment of State Road (from Ellsworth Road to Michigan Avenue) through Pittsfield Township. DLZ was contracted to develop road improvement alternatives that accommodated existing and projected traffic […]

Kennedy Avenue Improvements (US 30 to Main Street)

Overview The purpose of this project was to raise the roadway and bridge above the levee to alleviate roadway flooding. The other goal was to create a gateway between Hammond and Highland. The last objective was to provide access for pedestrians to cross Kennedy Avenue without walking across five lanes of traffic. Process The original […]

Westlake Corridor PES

Overview The West Lake Corridor is a 9-mile extension of NICTD’s passenger rail service from Hammond to Dyer, Indiana. Mile Track Extension 0 Bridges 0 Miles of Retaining Walls 0 Process The project involved development of the Final Environmental Impact Statement, preparation and submission of an FTA New Starts Grant Application, and development of 30% […]

South Bend Airport Realignment

Overview Progressing with an airport improvement project that included extending the main runway, the St. Joseph County Airport Authority determined that the South Shore Railroad’s track clearance envelope and catenary poles extended into the required clear airspace for the proposed runway extension. The Northern Indiana Commuter Transportation District (NICTD), which operated the Chicago, South Shore, […]