CUY-2-1441 Bridge
Overview This 6,580-foot-long, multi-span bridge carries SR 2 (formerly known as Main Avenue) over the Cuyahoga River Valley is located in the City of Cleveland. DLZ was responsible for the annual physical condition inspection of the bridge from 2023 to 2025. The work included reach-all access to the upper portions of the superstructures, rope-access to […]
I-94 Under French Road Bridge Replacement (Advance Bridge)
Overview DLZ was retained by the Michigan Department of Transportation (MDOT) to design the replacement of the I-94 bridge under French Road as part of Phase I of the I-94 Modernization Project. Working alongside a multidisciplinary team of 20 consultants in a collaborative, co-located office, DLZ supported a fast-track design effort for nine advance bridge […]
Holt Road over Doan Creek
Overview DLZ provided bridge design services for the superstructure replacement of Holt Road over Doan Creek, the culvert replacement of Holt Road over the Unnamed Tributary to Doan Creek, and channel improvements to the Unnamed Tributary. Process This work included field visits with the Client and EGLE to coordinate the permit requirements, bridge design, local […]
Satyam Mandloi, PE, SE
Michael Kummeth, PE
Matt Lawler, PE
Carrie Hamel, PE
Sherman-Minton Bridge
Overview The I-64 Sherman-Minton Bridge Design-Build project consists of performing major rehabilitation work to the more than 60-year-old Ohio River crossing. Following the discovery of severe deterioration during a routine inspection in 2015, the bridge was closed to traffic until repairs could be completed. The closure prompted an immediate study and the development of preliminary […]
Nickel Plate Trail
Overview The City of Kokomo retained DLZ to provide construction inspection and administration services for federal-aid construction of a single span bridge for the Nickel Plate Trail over SR 931. Process Having the unique distinction of being the only bridge over SR 931, it serves as a key connection to more than 40 miles of […]
Herrington Lake Bridge
Overview This project involved replacement of the KY 152 Kennedy Mill Bridge over Herrington Lake, constructed in 1924 and spanning 800’ total. Process The Chicago Chimney Company constructed piers 2 and 3 as hollow concrete shafts before impounding the lake. Herrington Lake has the deepest waters in Kentucky with two deep-water piers approximately 190’ and […]
Mishawaka Avenue Bridge
Overview Originally constructed in 1924 and rehabilitated in 1987, the Mishawaka Avenue Bridge was a four-span, earth-filled reinforced concrete arch bridge spanning 389 feet over the St. Joseph River. With a clear roadway width of 30 feet, the structure was considered eligible for the National Register of Historic Places. Process DLZ evaluated the bridge’s condition […]
Main Street Bridge
Overview The City of Columbus contracted DLZ to conduct conceptual, preliminary, and final design of a replacement for the Main Street Bridge over the Scioto River in Downtown Columbus. Process The City wanted a distinctive bridge and the 660-foot bridge features a single rib arch designed with a unique 10-degree incline. It is the world’s […]