Bruce Bauchmire
Pablo Porras, PhD
Xacbal Hydroelectric Plant, Guatemala
Overview DLZ Carbon was hired by the Terra Group as the project’s owner engineer, which included the review of the final design and plans as well as advising in the field supervision of civil works. Process This was a hydroelectric project using waters of the Xacbal river through a diversion dam with lateral intake structure […]
Los Laureles Hydroelectric Plant, Honduras
Overview DLZ Carbon was hired by Genera S.A. de C.V. for the feasibility study, final design, construction plans of civil works, and technical inspection of the project. Process This hydroelectric project uses water from the San Juan River. It consists of a concrete dam with an overflow spillway, lateral intake, and desander structure. The water […]
Negros II Hydroelectric Plant, Costa Rica
Overview DLZ Carbon was contracted by Hidroeléctrica Cuatro Bocas S.A. to carry out the feasibility, final design of the civil works, and the floodgates. The plant is owned by the Servicios Públicos de Heredia. Process This was a hydroelectric project with a design flow of 24.5 m3 / s. It has two horizontal axes Francis […]