US 27 – From KY 34 to the Lancaster Bypass
Overview DLZ is a subconsultant to Stantec Consulting Services, Inc. for the project, which involves completing the realignment and improvement for US 27 from Standford to KY 34 north of Lancaster, including the Bypass around the west side of Lancaster. Process DLZ’s primary responsibilities for the project are surveying, utility coordination, preparing right of way […]
DuPage County Various Traffic Signal Design Services
Overview DLZ prepared construction documents for 5 signalized intersections along County Farm Road (Williams St to Jewel Rd) in front of the DuPage County Government Center in Wheaton, Illinois. Process The scope of services includes a topographic survey with ROW along the corridor, pavement marking plans, the evaluation and redesign of existing ADA ramps, the […]
SR 930 INDOT (Intersection Alternative Analysis)
Overview DLZ was selected by the Indiana Department of Transportation (INDOT) Fort Wayne District to complete the Preliminary Engineering for the SR 930 Intersection Improvements project in the City of New Haven. Process The intersection of SR 930 and Maplecrest Road has experienced a significant number of rear end crashes, which indicates a congestion issue […]
Ports of Indiana
Overview This design-build project involved the design and construction of a new railroad bridge over Line Creek on the Jeffersonville, Indiana facility of the Ports of Indiana Authority. Process The new structure consists of a single 50’ span and 40’-6” wide (fascia to fascia) utilizing 7 – HN 48 49 Hybrid PC -I Girders, at […]
Brent Spence Bridge
Overview The Brent Spence Bridge Corridor Project consists of three distinct and major components: the approach work (highways, bridges, retaining walls) in Covington, the new “Companion Bridge” over the Ohio River, and the approach work in Cincinnati. Process DLZ is the Geotechnical Engineer-of-Record for all work in Covington and is also providing all geotechnical drilling […]
Indiana State Road 120
Overview DLZ was selected by the Indiana Department of Transportation (INDOT) Fort Wayne District to complete the Preliminary Engineering for the SR 120/SR15 Small Towns Pavement Replacement project in the Town of Bristol, Indiana. Process This project involved pavement reconstruction and rehabilitation along SR 120 in Bristol from 0.86 miles west of the SR 15 […]
US 20
Overview DLZ was hired by the Airport Authority to prepare an engineering study that would evaluate several alternative routes for the relocation of Lincolnway West. Lincolnway West serves as a gateway to the City of South Bend as visitors travel from US-31/US-20 past the South Bend International Airport to downtown. In 2000, the South Bend […]
Garrard County US 27
Overview DLZ is working as a subconsultant for Stantec Consulting Services, Inc. on this project, the northernmost section of US 27. The project involves the reconstruction of 4.3 miles of a two-lane roadway with a typical section to a four-lane depressed median. Process DLZ’s primary responsibilities for the project are surveying, utility coordination, preparing right […]
State Road Improvement Project Early Preliminary Engineering Study
Overview The State Road Improvement Project was an Early Preliminary Engineering (EPE) study and Environmental Assessment (EA) conducted for the Washtenaw County Road Commission (WCRC) for a 3-mile segment of State Road (from Ellsworth Road to Michigan Avenue) through Pittsfield Township. DLZ was contracted to develop road improvement alternatives that accommodated existing and projected traffic […]
Kennedy Avenue Improvements (US 30 to Main Street)
Overview The purpose of this project was to raise the roadway and bridge above the levee to alleviate roadway flooding. The other goal was to create a gateway between Hammond and Highland. The last objective was to provide access for pedestrians to cross Kennedy Avenue without walking across five lanes of traffic. Process The original […]
Westlake Corridor PES
Overview The West Lake Corridor is a 9-mile extension of NICTD’s passenger rail service from Hammond to Dyer, Indiana. Mile Track Extension 0 Bridges 0 Miles of Retaining Walls 0 Process The project involved development of the Final Environmental Impact Statement, preparation and submission of an FTA New Starts Grant Application, and development of 30% […]
South Bend Airport Realignment
Overview Progressing with an airport improvement project that included extending the main runway, the St. Joseph County Airport Authority determined that the South Shore Railroad’s track clearance envelope and catenary poles extended into the required clear airspace for the proposed runway extension. The Northern Indiana Commuter Transportation District (NICTD), which operated the Chicago, South Shore, […]
I-69 Section 4 EIS
Overview The United States Congress, through the Intermodal Surface Transportation Efficiency Act of 1991, established Corridor 18 as a high-priority transportation corridor. The corridor, which was modified by Congress in 1998 through the Transportation Equity Act for the 21st Century, was proposed to become a highway of national significance extending from the Michigan/Canada border to […]
Douglas Road
Overview This project includes two bridge replacements over Juday Creek. Process An Engineer’s Report was initially developed to look at traffic and operational analysis, alignment alternatives, and stormwater management. Following recommendation of the Engineer’s Report, design tasks include horizontal alignments involving a shift of the existing roadway alignment, vertical alignments, added travel lanes, signalized intersection […]
Main Street Underpass
Overview DLZ provided landscape architecture, survey, right-of-way engineering, environmental services, railroad, highway, utility design engineering, and construction observation services for the north-south corridor grade separation study of arterial routes and gateway into the Downtown District of Mishawaka. Process DLZ helped advance a grade separation project along Mishawaka’s Main Street corridor, evaluating crossing alternatives and developing […]
US 41 & M28 Roundabout Design
Overview DLZ was contracted by the MDOT Superior Region Ishpeming TSC to provide design of a multi-lane roundabout intersection and new municipal utilities. Process This project was designed following the latest Reference Information Document (RID) guidelines and 3D modeling utilizing Geopak SS2. The project included roundabout design, capacity analysis, public information campaign, geometric analysis, utility […]
CUY-2-1441 Bridge
Overview This 6,580-foot-long, multi-span bridge carries SR 2 (formerly known as Main Avenue) over the Cuyahoga River Valley is located in the City of Cleveland. DLZ was responsible for the annual physical condition inspection of the bridge from 2023 to 2025. The work included reach-all access to the upper portions of the superstructures, rope-access to […]
I-94 Under French Road Bridge Replacement (Advance Bridge)
Overview DLZ was retained by the Michigan Department of Transportation (MDOT) to design the replacement of the I-94 bridge under French Road as part of Phase I of the I-94 Modernization Project. Working alongside a multidisciplinary team of 20 consultants in a collaborative, co-located office, DLZ supported a fast-track design effort for nine advance bridge […]
Holt Road over Doan Creek
Overview DLZ provided bridge design services for the superstructure replacement of Holt Road over Doan Creek, the culvert replacement of Holt Road over the Unnamed Tributary to Doan Creek, and channel improvements to the Unnamed Tributary. Process This work included field visits with the Client and EGLE to coordinate the permit requirements, bridge design, local […]
Madison Avenue Corridor Road Diet & Trail
Overview DLZ is retained by the City of Indianapolis to develop Pavement Rehabilitation Plans for approximately 3.50 miles of Madison Avenue between Hanna Avenue and Ray Street in Indianapolis, Indiana. Process The project was split into three phases and the purpose of the projects are to introduce traffic calming via “road diet”, construct the first […]