Projects Water Resources

Rocky Point Road Bridge No. 1479

Clark County, Ohio

Rocky Point Road Bridge No. 1479 and Township Road 136 Construction Management, Monitoring & Testing

DLZ provided the Clark County Engineer with construction management, monitoring & testing for the rehabilitation of the existing earth filled stone arch historical structure over Mud Run which entailed the construction of a reinforced concrete slab over the existing arch, installation of new roadway approaches and new concrete retaining walls on soldier piles.  All of these improvements were monitored to conform to ODOT and to ensure project specifications were met and the construction and materials were of the quality required.

DLZ provided a number of services including:

  • Masonry Inspections
  • Solider pile excavation & installation monitoring
  • Reinforcing steel verification
  • Concrete testing
  • Soil and aggregate testing
  • Asphalt testing
  • Documenting as-built conditions
  • Tracking quantities
  • Organizing pay estimates and change orders
  • Leading pre-construction & progress meetings
  • Mitigating construction delays