Los Laureles Hydroelectric Plant, Honduras

This hydroelectric project has a gross head of 78m and uses water from the San Juan River. It consists of a concrete dam with an overflow spillway, lateral intake, and desander structure. The water is conducted through a low-pressure steel pipe, followed by a 640 m long headrace tunnel to a pressure chamber serving as an intake site for the pressure pipeline. The powerhouse has 2 horizontal-shaft Francis turbines.

DLZ Carbon was hired by Genera S.A. de C.V. for the feasibility study, final design, construction plans of civil works, and technical inspection of the project.

Services

Clean Energy

Market

Clean Energy

Location

Department of Atlántida, Honduras