Rosie Emerges After Yearlong, 6,240-foot Journey

Rosie, a massive 30-foot wide and 300-foot long tunnel boring machine, emerged in the fall of 2018 after a yearlong, 6,240-foot journey under downtown Akron, Ohio. This gigantic tunnel boring machine began building the 27-ft diameter Ohio Canal Interceptor Tunnel in August 2017. The tunnel begins at Hickory Street in the Cascade Valley area and […]