Pablo Porras, PhD
Negros II Hydroelectric Plant, Costa Rica
Overview DLZ Carbon was contracted by Hidroeléctrica Cuatro Bocas S.A. to carry out the feasibility, final design of the civil works, and the floodgates. The plant is owned by the Servicios Públicos de Heredia. Process This was a hydroelectric project with a design flow of 24.5 m3 / s. It has two horizontal axes Francis […]
Proquinal PV and Battery Installation, Costa Rica
Overview DLZ Carbon was hired by Swissol for supervision of the installation of the photovoltaic system, as well as the interconnection system of the BESS to the electrical network of the factory. Process Proquinal Costa Rica, a manufacturing firm, developed a 275 kW solar PV Project installing 690 solar panels in a roofed parking lot, […]
Cooperativo PV Plant, Costa Rica
Overview DLZ Carbon was hired to perform the civil and electric balance-of-plant (BoP) design, including access roads, runoff and stormwater management, electrical conduits, service buildings, and control buildings. DLZ Carbon was also assigned the construction supervision of the project. Process The 5-MW Cooperativo PV plant is owned by Conelectricas and Coopelesca and is located in […]
Chiripa Wind Power Plant, Costa Rica
Overview DLZ Carbon was hired by Acciona Energy for BoP construction planning and foundation design of wind turbine towers. Process This is a wind power project belonging to ICE and developed by Acciona Energy under BOT contract. It has 33 wind turbine towers interconnected by an underground energy collection system to a control building and […]
Central Valley Wind Power Project, Costa Rica
Overview DLZ Carbon was hired by JBM Consortium for the final design and BoP construction planning. Process This wind power project belongs to Compañía Nacional de Fuerza y Luz (CNFL) and was developed by JBM Consortium. It has 17 ENERCON 55m high wind turbine towers interconnected by an underground energy collection system to a control […]
Guanacaste Wind Power Plant, Costa Rica
Overview DLZ Carbon was hired by Consorcio Eólico JES to develop the bidding document for the BoP contractor, the final design, and construction plans for BoP. Process This wind farm was developed under a BOT scheme, promoted by the Instituto Costarricense de Electricidad (ICE) and developed by Consorcio Eólico JES. It consists of 55 ENERCON […]