South Bend Airport Realignment
Overview Progressing with an airport improvement project that included extending the main runway, the St. Joseph County Airport Authority determined that the South Shore Railroad’s track clearance envelope and catenary poles extended into the required clear airspace for the proposed runway extension. The Northern Indiana Commuter Transportation District (NICTD), which operated the Chicago, South Shore, […]
I-69 Section 4 EIS
Overview The United States Congress, through the Intermodal Surface Transportation Efficiency Act of 1991, established Corridor 18 as a high-priority transportation corridor. The corridor, which was modified by Congress in 1998 through the Transportation Equity Act for the 21st Century, was proposed to become a highway of national significance extending from the Michigan/Canada border to […]
Douglas Road
Overview This project includes two bridge replacements over Juday Creek. Process An Engineer’s Report was initially developed to look at traffic and operational analysis, alignment alternatives, and stormwater management. Following recommendation of the Engineer’s Report, design tasks include horizontal alignments involving a shift of the existing roadway alignment, vertical alignments, added travel lanes, signalized intersection […]
Jonathan Mooney, PLA, LEED AP
Jason Strobel
Drago Popovic
Dave Carmien, LS, PE, CH
Robert Willey, EI
Tim Fought, PE
Main Street Underpass
Overview DLZ provided landscape architecture, survey, right-of-way engineering, environmental services, railroad, highway, utility design engineering, and construction observation services for the north-south corridor grade separation study of arterial routes and gateway into the Downtown District of Mishawaka. Process DLZ helped advance a grade separation project along Mishawaka’s Main Street corridor, evaluating crossing alternatives and developing […]
Madison Avenue Corridor Road Diet & Trail
Overview DLZ is retained by the City of Indianapolis to develop Pavement Rehabilitation Plans for approximately 3.50 miles of Madison Avenue between Hanna Avenue and Ray Street in Indianapolis, Indiana. Process The project was split into three phases and the purpose of the projects are to introduce traffic calming via “road diet”, construct the first […]
Mishawaka Riverwalk Extension Race to Cedar
Overview The City of Mishawaka commissioned DLZ in 2011 to develop a master plan to promote and guide the extension of the Mishawaka Riverwalk along the Saint Joseph River. Process The master plan included inventory and analysis, preliminary concept, budget, and delineation of property acquisition needs. DLZ then assisted the City acquiring the new riverfront […]