Process
An Engineer’s Report was initially developed to look at traffic and operational analysis, alignment alternatives, and stormwater management. Following recommendation of the Engineer’s Report, design tasks include horizontal alignments involving a shift of the existing roadway alignment, vertical alignments, added travel lanes, signalized intersection reconstruction, drainage design, two 3-sided box culvert designs, multi-use path, wetland mitigation, maintenance of traffic including detours, retaining wall, utility coordination and subsurface utility engineering, geotechnical investigation, and right of way engineering and acquisition.