Overview

Kilbourne Run Sports Park has become one of the city’s busiest soccer facilities that hosts over 30,000 participants each year. With the improvements to this park, it will attract even more players and leagues to play at this facility.

Acres dedicated
to athletic space
0
Full sizes 11v11
artificial turf fields
0
full sized 11v11
natural grass fields
0

Process

The master plan process began with a design team and city team kick-off meeting. The process involved development of both site and architectural programs, several workshops with the city stakeholders, the local community stakeholders, and the soccer community stakeholders including the Columbus Crew MLS franchise to ensure the functionality and goals are met for this facility. The process also included the development of preliminary design alternatives and the refinement of a preferred concept alternative. Accessibility to and from the park was an issue in the past, so a study was done to determine what would be the best improvements for access and safety for the entrance to the park.

The project required several permits from different agencies. Permits through the city of Columbus that were needed for the project included a demolition permit for each existing structure being removed, building permits for each new structure, preliminary and final site compliance, CC-Plan submittals for storm and sanitary improvements, water service plans, tree demolition and restoration permit, and Drawer-E plans for the roundabout improvements within Westerville Road (SR-3). Other permits needed were an ODOT traffic analysis and LA encroachment permit for improvements along Westerville Road, an OEPA NPDES Permit, an OEPA PTI for sanitary and waterline Improvements to the main sewers, and a 401/404 Nationwide Permit for impacts to any wetlands on the site.

DLZ also provided the city construction administration services along with special inspections and testing.

Results

The park is currently a soccer-specific facility that stretches over 62-acres with 35 of those acres dedicated to athletic space. DLZ’s design of the improvements to Kilbourne Run Sports Park provided prime fields and facilities that increased access to soccer and other field sports for the Columbus community and positioned Columbus as a destination for regional tournaments. The improvements included four full sized 11v11 natural grass fields, six full sized 11v11 artificial turf fields with premium LED sports lighting, shelter areas, adequate parking for soccer events, restroom facilities, the Championship Stadium plaza and building, maintenance facility, loop paths and trails updates to the Olentangy – Alum Creek Connector trail part of the Linden Green Belt Trail.

The improvements to the park increased the parking to 1,050 public parking spaces including 20 ADA handicap parking spaces. The park also includes 20 bike racks located throughout the park. Security lighting and wayfinding within the parking lot will help patrons to their cars.

To eliminate the former issues on the entrance to the park, DLZ designed a single-lane roundabout at the relocated park entrance on Westerville Road/SR-3, aligning it with the existing Westerville Woods intersection. As the lead on this project, DLZ implemented the first design compliant with the City’s Vision Zero Initiative and newly established Roundabout Evaluation and Implementation Policy.