KY 213 Widening
Overview This project involves Phase I and Phase II design for the reconstruction of KY 213 in Powell County from KY 11 (MP 7.6) in Stanton to Mountain Road (MP 11.3), approximately 3.7 miles. Process This project includes improvements to the urban section in Stanton, widening from a 2-lane road with some limited areas of […]
I-275 Reconstruction
Overview DLZ was selected by the MDOT for the design and preparation of construction documents initially for the rehabilitation of six miles of six-lane freeway, from Ford Road to Six Mile Road, including interchanges at Ford Road and Ann Arbor Road in the cities of Canton, Plymouth, and Livonia. The project was then changed to […]
Ohio Turnpike
Overview This Ohio Turnpike and Infrastructure Commission project consisted of the redecking of the mainline structure of IR 80 at MP 188.2 over State Route 43. Process Work included a new deck on composite beams along with new parapets, approach and abutment slabs, and approach pavement. New elastomeric bearings were installed on rehabilitated beam seats. […]
Cuyahoga Valley National Park Pedestrian Bridge
Overview Summit County retained DLZ to design a new 200-foot pedestrian connector from the Cuyahoga Valley National Park Visitor Center and Trail Head across the Cuyahoga River. This location is a popular starting point for the park’s sprawling trails, and the need for improved pedestrian safety and access motivated this project. In addition to bridge […]
Waterford Riverwalk Extension
Overview DLZ was selected by the Charter Township of Waterford to provide professional engineering and surveying services related to the planning and design of an extension to their existing Riverwalk pathway network. Process The proposed pathway extension includes a non-motorized HMA pathway, a timber and composite boardwalk, and a prefabricated pedestrian bridge. The design incorporates […]
Mishawaka Riverwalk Extension Race to Cedar
Overview The City of Mishawaka commissioned DLZ in 2011 to develop a master plan to promote and guide the extension of the Mishawaka Riverwalk along the Saint Joseph River. Process The master plan included inventory and analysis, preliminary concept, budget, and delineation of property acquisition needs. DLZ then assisted the City acquiring the new riverfront […]