Portage DPW Masterplan
Overview DLZ was asked to perform an assessment study on the existing buildings and site conditions at the Department of Public Works in Portage, Michigan. Analyzed safety of 5 structures 0 acres 0 Process This study analyzed the function, structural condition, vehicular access, space requirements, and safety of 5 structures on approximately 7.5 acres of […]
Trey Taliaferro
USPS Detroit Motor Vehicle Station & Parking Expansion New Construction Owned
Overview The United States Postal Service (USPS) has contracted DLZ to provide Design-Build Services to construct a new motor vehicle services (VMF) and transportation operations facility. sq ft 0 k acres 0 concrete pavement 0 -inch Process The new facility is approximately 5,200 SF, including 6.3 acres of 8-inch concrete pavement. The space program includes […]
Laura Gruzwalski
North County Campus – New Sheriff’s Substation and Health Clinic
Overview Kent County contracted DLZ to provide A/E design services for a new North Campus facility to accommodate a Sheriff’s Substation, Health Clinic, and flex office and training space for County personnel. square feet 0 k acre site 0 Results The proposed project program totals approximately 30,000 SF, built on a 14-acre site in Cedar […]
State Road Improvement Project Early Preliminary Engineering Study
Overview The State Road Improvement Project was an Early Preliminary Engineering (EPE) study and Environmental Assessment (EA) conducted for the Washtenaw County Road Commission (WCRC) for a 3-mile segment of State Road (from Ellsworth Road to Michigan Avenue) through Pittsfield Township. DLZ was contracted to develop road improvement alternatives that accommodated existing and projected traffic […]
Andrew Murray, GISP
GLWA 14 Mile Transmission Loop
Overview The Great Lakes Water Authority (GLWA) is responsible for operating and maintaining five water treatment plants, one wastewater plant and associated water transmission and wastewater collection infrastructure serving 126 municipalities and nearly 4 million people in the metro-Detroit area municipalities served 0 People in the metro-detroit area 0 M Mile Transmission Loop 0 Process […]
Camp Grayling Surface Water Quality, Habitat and Biological Assessments
Overview Camp Grayling, a U.S. National Guard training facility, encompasses a total land area of approximately 147,000 acres and stretches across portions of Crawford, Kalkaska, and Otsego Counties in northern Michigan. acres 0 K Major Watersheds 0 Different sample sites 0 Process DLZ was contracted by the Michigan Department of Military & Veterans Affairs to […]
Ben Baker, PLA, ASLA, LEED AP
Independence Township PFAS
US 41 & M28 Roundabout Design
Overview DLZ was contracted by the MDOT Superior Region Ishpeming TSC to provide design of a multi-lane roundabout intersection and new municipal utilities. Process This project was designed following the latest Reference Information Document (RID) guidelines and 3D modeling utilizing Geopak SS2. The project included roundabout design, capacity analysis, public information campaign, geometric analysis, utility […]
I-94 Under French Road Bridge Replacement (Advance Bridge)
Overview DLZ was retained by the Michigan Department of Transportation (MDOT) to design the replacement of the I-94 bridge under French Road as part of Phase I of the I-94 Modernization Project. Working alongside a multidisciplinary team of 20 consultants in a collaborative, co-located office, DLZ supported a fast-track design effort for nine advance bridge […]
Holt Road over Doan Creek
Overview DLZ provided bridge design services for the superstructure replacement of Holt Road over Doan Creek, the culvert replacement of Holt Road over the Unnamed Tributary to Doan Creek, and channel improvements to the Unnamed Tributary. Process This work included field visits with the Client and EGLE to coordinate the permit requirements, bridge design, local […]
I-275 Reconstruction
Overview DLZ was selected by the MDOT for the design and preparation of construction documents initially for the rehabilitation of six miles of six-lane freeway, from Ford Road to Six Mile Road, including interchanges at Ford Road and Ann Arbor Road in the cities of Canton, Plymouth, and Livonia. The project was then changed to […]
Waterford Riverwalk Extension
Overview DLZ was selected by the Charter Township of Waterford to provide professional engineering and surveying services related to the planning and design of an extension to their existing Riverwalk pathway network. Process The proposed pathway extension includes a non-motorized HMA pathway, a timber and composite boardwalk, and a prefabricated pedestrian bridge. The design incorporates […]