Douglas Road
Overview This project includes two bridge replacements over Juday Creek. Process An Engineer’s Report was initially developed to look at traffic and operational analysis, alignment alternatives, and stormwater management. Following recommendation of the Engineer’s Report, design tasks include horizontal alignments involving a shift of the existing roadway alignment, vertical alignments, added travel lanes, signalized intersection […]
Ohio Turnpike and Infrastructure Commission Westgate Toll Plaza Wetland Permitting and Mitigation Design
Overview DLZ was selected to provide services for wetland delineations and design services for a new toll plaza near the Indiana border on the Ohio Turnpike. The location and design of the new plaza impacted sensitive environmental resources, including several wetlands delineated by DLZ during the preliminary alternatives development for the plaza location. Process DLZ […]
GLWA 14 Mile Transmission Loop
Overview The Great Lakes Water Authority (GLWA) is responsible for operating and maintaining five water treatment plants, one wastewater plant and associated water transmission and wastewater collection infrastructure serving 126 municipalities and nearly 4 million people in the metro-Detroit area municipalities served 0 People in the metro-detroit area 0 M Mile Transmission Loop 0 Process […]
Camp Grayling Surface Water Quality, Habitat and Biological Assessments
Overview Camp Grayling, a U.S. National Guard training facility, encompasses a total land area of approximately 147,000 acres and stretches across portions of Crawford, Kalkaska, and Otsego Counties in northern Michigan. acres 0 K Major Watersheds 0 Different sample sites 0 Process DLZ was contracted by the Michigan Department of Military & Veterans Affairs to […]
Independence Township PFAS
Main Street Underpass
Overview DLZ provided landscape architecture, survey, right-of-way engineering, environmental services, railroad, highway, utility design engineering, and construction observation services for the north-south corridor grade separation study of arterial routes and gateway into the Downtown District of Mishawaka. Process DLZ helped advance a grade separation project along Mishawaka’s Main Street corridor, evaluating crossing alternatives and developing […]
US 41 & M28 Roundabout Design
Overview DLZ was contracted by the MDOT Superior Region Ishpeming TSC to provide design of a multi-lane roundabout intersection and new municipal utilities. Process This project was designed following the latest Reference Information Document (RID) guidelines and 3D modeling utilizing Geopak SS2. The project included roundabout design, capacity analysis, public information campaign, geometric analysis, utility […]
CUY-2-1441 Bridge
Overview This 6,580-foot-long, multi-span bridge carries SR 2 (formerly known as Main Avenue) over the Cuyahoga River Valley is located in the City of Cleveland. DLZ was responsible for the annual physical condition inspection of the bridge from 2023 to 2025. The work included reach-all access to the upper portions of the superstructures, rope-access to […]
I-94 Under French Road Bridge Replacement (Advance Bridge)
Overview DLZ was retained by the Michigan Department of Transportation (MDOT) to design the replacement of the I-94 bridge under French Road as part of Phase I of the I-94 Modernization Project. Working alongside a multidisciplinary team of 20 consultants in a collaborative, co-located office, DLZ supported a fast-track design effort for nine advance bridge […]
Holt Road over Doan Creek
Overview DLZ provided bridge design services for the superstructure replacement of Holt Road over Doan Creek, the culvert replacement of Holt Road over the Unnamed Tributary to Doan Creek, and channel improvements to the Unnamed Tributary. Process This work included field visits with the Client and EGLE to coordinate the permit requirements, bridge design, local […]
Madison Avenue Corridor Road Diet & Trail
Overview DLZ is retained by the City of Indianapolis to develop Pavement Rehabilitation Plans for approximately 3.50 miles of Madison Avenue between Hanna Avenue and Ray Street in Indianapolis, Indiana. Process The project was split into three phases and the purpose of the projects are to introduce traffic calming via “road diet”, construct the first […]
KY 213 Widening
Overview This project involves Phase I and Phase II design for the reconstruction of KY 213 in Powell County from KY 11 (MP 7.6) in Stanton to Mountain Road (MP 11.3), approximately 3.7 miles. Process This project includes improvements to the urban section in Stanton, widening from a 2-lane road with some limited areas of […]
I-275 Reconstruction
Overview DLZ was selected by the MDOT for the design and preparation of construction documents initially for the rehabilitation of six miles of six-lane freeway, from Ford Road to Six Mile Road, including interchanges at Ford Road and Ann Arbor Road in the cities of Canton, Plymouth, and Livonia. The project was then changed to […]
Ohio Turnpike
Overview This Ohio Turnpike and Infrastructure Commission project consisted of the redecking of the mainline structure of IR 80 at MP 188.2 over State Route 43. Process Work included a new deck on composite beams along with new parapets, approach and abutment slabs, and approach pavement. New elastomeric bearings were installed on rehabilitated beam seats. […]
Cuyahoga Valley National Park Pedestrian Bridge
Overview Summit County retained DLZ to design a new 200-foot pedestrian connector from the Cuyahoga Valley National Park Visitor Center and Trail Head across the Cuyahoga River. This location is a popular starting point for the park’s sprawling trails, and the need for improved pedestrian safety and access motivated this project. In addition to bridge […]
Waterford Riverwalk Extension
Overview DLZ was selected by the Charter Township of Waterford to provide professional engineering and surveying services related to the planning and design of an extension to their existing Riverwalk pathway network. Process The proposed pathway extension includes a non-motorized HMA pathway, a timber and composite boardwalk, and a prefabricated pedestrian bridge. The design incorporates […]
Mishawaka Riverwalk Extension Race to Cedar
Overview The City of Mishawaka commissioned DLZ in 2011 to develop a master plan to promote and guide the extension of the Mishawaka Riverwalk along the Saint Joseph River. Process The master plan included inventory and analysis, preliminary concept, budget, and delineation of property acquisition needs. DLZ then assisted the City acquiring the new riverfront […]
SWACO Phase 1 Maintenance Expansion
Client Project Type Capabilities Project Size Add Your Heading Text Here Overview Lorem ipsum dolor sit amet consectetur. Duis molestie duis lorem id ullamcorper urna at vel. Nullam dolor elementum aliquam ridiculus sollicitudin. Massa eu faucibus cursus sit. Risus purus faucibus ac at. Stat title 0 % Stat title 0 X Stat title # 0 […]